Liberty Mutual North Texas Campus

NIght view of Liberty Mutual North Texas Campus- Telios PC Project

As a part of a corporate strategy to attract top talent, the new 9.3-acre campus includes two, 20-story towers connected by a 4,500-car parking garage in back and retail on the lower levels. With more than 1 million square feet of office space, the new campus will consolidate a variety of operations which are currently […]

Park Place River Oaks

Commercial Construction Project Telios PC

Representing the third phase of the Park Place River Oaks development, this Class A office building broke ground in February 2019. At 210,000 SF, the building will have 27,000+ SF office floor plates. A conference center and tenant lounge on the 9th floor will be adjacent to an outdoor landscaped terrace offering views of the […]

Irvine Ranch Water District Solar

Irvine Ranch Water District Solar Energy Project

Irvine Ranch Water District (IRWD) sought to leverage unused land above two below-grade water cisterns to create an independent 12kV microgrid incorporating PV and battery storage to satisfy the plant’s power demands and create energy autonomy. Locating the PV above the water cisterns meant the entire installation had to remain above grade, eliminating the possibility […]

Honolulu Airport Phase II Solar

This was the second phase of a three-phase project in which HIDOT sought to add additional PV capacity totaling 5.33 MWdc to existing parking garages and terminal roofs. The PV expansion occurred in three geographic areas on the airport campus: two parking garage canopies (totaling 3.4 MW) and nine terminal roofs (totaling 1.93 MW). The […]

Toyota Port of Long Beach Fuel Cell

Toyota Port in Long Beach, completed by Telios

Telios partnered with Toyota and Fuel Cell Energy to integrate a 3 MW fuel cell plant into Toyota’s vehicle processing center at the Port of Long Beach, California. The project is a groundbreaking development in which directed biogas is used as the fuel cell’s feedstock, providing the entire campus with 100% emissions-free, renewable electricity and […]

American Airlines Central Utility Plant

Telios provided Enhanced Commissioning services for the new central plant at the American Airlines Training and Conference Center Building. The building is 18,000 square feet and includes two levels.The scope of work included the commissioning of all mechanical, electrical and plumbing equipment being installed. Telios’ goal was to verifty that all systems reflect the objectives […]

Ben E. Keith Distribution Campus – Little Rock, Arkansas

Ben E Keith Little Rock- Commissioning By Telios PC

Ben E. Keith supplies a full line of produce, frozen foods, meats, dry groceries, refrigerated foods, paper goods, equipment and supplies to restaurants, and other institutional businesses. To meet the demands of the growing foodservice market, the company purchased a 68.57 acre site to build a 429,302 square foot warehouse. The project consists of a […]

Toyota HUB/Cell Cabinet Design-Build Solution

To support the internal connectivity requirements for new and existing manufacturing plant facilities, Toyota teamed with Telios Construction Management (TCM) to design and build a self-contained technology infrastructure that manages the plant floor equipment data monitoring and storage requirements back to their local data center. The system architecture is designed around a network of 45 […]

Mazda Toyota Manufacturing US

With the assistance of the Telios Technology team, Telios Construction Management designed and manufactured 39 Cell Cabinets and 6 HUB Cabinets. The cabinets are to provide a self-contained technology infrastructure that manages the plant floor equipment data monitoring and storage requirements back to their local data center.To support MTMUS with maintaining the warranty requirements of […]

The Center

The Center offers intellectual and developmentally disabled individuals services and programs that help them lead meaningful lives. These include employment training, community living, health and wellness, and day habitation. Moving to a new location offered The Center the opportunity to build modern facilities that address their growing organization and incorporates community outreach. The program has […]